PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Starting installing safety rails at Elev. 1,2,3 (1st Floor) Facing South (800x600).jpg Stripping the shear wall panels at Elev. 5,6 (3rd Floor) Facing West (800x600).jpg Continued installing pour stops around Derrick -3 (2nd Floor) Facing North-West (800x600).jpg Excavating for the sanitary sewer from column line G-J to 4-5 Facing West (800x600).jpg Stair -5 before concrete pour Facing West(800x600).jpg
Previous page Stair -5 before concrete pour Facing West(800x600)
Stair -5 before concrete pour Facing West(800x600)